Change run failed with error “Rollup for InfoCube
XYZ terminated”:
IF the rollups are running, no change run is possible.
Deactivate the aggregates for XYZ
Click on manage
Go to Roll up tab and click on “Aggregates” button
Select all the aggregates
Click on Deactivate button
Fix Change Run
1. Go to Hierarchy /Attribute Changes for reporting window and click on the “Stop”
2. Click on “SubseqProcessing” button and copy the parameters in notepad before to deleting them.
3. Don’t click on trash button, just delete them manually and click the green arrow button to continue.
4. We are removing these events because we don’t want to start again “Transaction Data” which is the subsequent event.
5. Click on “Selection” button and copy the parameter in the Event field to note pad then click in the “Immeditate” button and unchecked the option “Periodic job” and save it.
6. Selection
7. Click on “Execute” button.
8. Monitor the job in SM37.
9. Once Hierarchy /Attribute Changes for reporting ran successfully you have to put the parameters back.
10. Click “Selection” button and chose “After Event” button and type in Event field the following:
11. Make sure the “Periodic job” check box is checked and Save it.
12. Click “Execute” button to schedule the “Periodic Job” and you will see a new scheduled job.
Run the Statistics refresh
Run the aggregates for the same cube
0 comments:
Post a Comment